Prestige Chikmagalur Project Schedule

Featured Image of Prestige Chikmagalur Project Schedule


Prestige Indavara Chikmagalur is a 33-acre plotted development by Prestige Group. It is 2–3 km from Chikmagalur town centre, Karnataka. The project has 140 luxury plots from 2,400 to 6,000 sq ft. Pre-launch opened in August 2026. The formal launch is on 10 December 2026. Infrastructure work follows across 8 milestone stages. This page covers the full project schedule from pre-launch to possession.

Project Schedule at a Glance


Milestone Target
Pre-launch opens August 2026
Formal launch and RERA registration 10 December 2026
Boundary wall and site clearing Early 2027
Internal roads and plot demarcation (140 plots) Mid 2027
Water supply and underground drainage network Late 2027
Electrical supply lines to each plot Early 2028
Street lighting and entry gate infrastructure Mid 2028
9.9-acre open-space zone and amenities Late 2028 – 2029
Layout completion certificate and possession On RERA-confirmed date

8 payment milestones are tied to infrastructure progress. The official possession date will be confirmed in the RERA filing at the December 2026 launch.

Stage 1 — Pre-Launch and RERA Registration (Aug–Dec 2026)


The pre-launch phase opened in August 2026. Buyers register interest and pay a booking amount during this period. They get priority plot selection at the formal December 2026 launch.

The formal launch is on 10 December 2026. Karnataka RERA registration is expected at the launch. RERA confirmation is mandatory before sale agreements are signed. No physical work starts before the December 2026 launch.

Stage 2 — Boundary Wall and Site Clearing (Early 2027)


The first visible work on the 33-acre Chikmagalur site is the perimeter boundary wall. This secures the full site before any internal work begins. Site clearing and ground levelling follow where required.

At 33 acres, the boundary wall covers a substantial perimeter. Completing it early defines the township boundary and prevents encroachment on the plot area.

Stage 3 — Internal Roads and Plot Demarcation (Mid 2027)


The internal road network is laid across the 33-acre township. Roads connect all 140 plots and the central open-space zone. Each of the 140 plots is demarcated on the ground with corner markers as per the approved layout plan.

At 4.2 plots per acre, the layout is low-density. Roads are wide and spaced to suit the hill-station character of Chikmagalur.

Stage 4 — Water Supply and Drainage (Late 2027)


Underground water supply and drainage lines are installed along all internal roads. Each plot gets a water connection point at its boundary. The stormwater drainage network handles rainfall across the 33 acres, which is significant given Chikmagalur's monsoon pattern.

Underground utilities are laid before road surfaces are finalised. This avoids cutting up finished roads later.

Stage 5 — Electrical Supply to Plots (Early 2028)


Underground HT and LT electrical lines are laid from the substation to each of the 140 plots. Each plot gets a power connection point at its boundary. Buyers can connect to grid power at possession without running long supply lines across the site.

Stage 6 — Street Lighting and Entry Gate (Mid 2028)


Street lighting poles and fixtures go up along all internal roads. The main entry gate, security booth, and access barriers are constructed at this stage. Internal signage and road markings are completed.

The entry gate and street lighting bring the township to a visible level of completion. This is the stage buyers see as the project taking its final shape.

Stage 7 — Open-Space Zone and Amenities (Late 2028 – 2029)


Prestige Indavara Chikmagalur dedicates 9.9 acres to open green spaces. This covers parks, green buffers, and open areas in keeping with the Western Ghats setting. The 9.9-acre zone is landscaped and fitted out at this stage.

The project's amenity areas within the open zone are completed here. The hill-station location means the landscaping draws on the natural coffee-country character of Chikmagalur.

Stage 8 — Layout Completion and Possession


The Karnataka government issues the layout completion certificate once all infrastructure meets the approved plan. Plot owners receive possession with all roads, utilities, and the open-space zone in place.

After possession, buyers may begin construction of their own homes or holiday retreats. Construction must follow local municipal approvals and the setback rules in the approved layout plan.

About the Project


Prestige Indavara Chikmagalur is in Karnataka's Western Ghats belt. It is 2–3 km from Chikmagalur town centre. Mullayanagiri, Karnataka's highest peak, is 21.6 km away. Jhari Falls is 23.6 km away. Baba Budangiri is 31.2 km away. Mangalore Airport is 120–150 km away via NH 73. Plots are priced from Rs 1.20 Crores (2,400 sq ft) to Rs 3.00 Crores (6,000 sq ft) at Rs 5,000 per sq ft.

FAQs


1. When does work start at Prestige Chikmagalur?

Physical work starts after RERA registration and formal launch on 10 December 2026. Site clearing and the boundary wall begin first. Internal road layout and plot demarcation for the 140 plots follow in early to mid 2027.

2. How many milestones does the project have?

The project has 8 payment milestones. Each milestone is linked to a stage of infrastructure — from site clearing and roads to utilities, street lighting, and the 9.9-acre open-space zone. Payment is released as each stage is completed.

3. What is the RERA status of Prestige Chikmagalur?

Karnataka RERA registration is expected at the formal launch on 10 December 2026. It has not yet been applied for. Verify the status on rera.karnataka.gov.in after the December 2026 launch. Do not sign the sale agreement before RERA is confirmed.

4. What is the possession date at Prestige Chikmagalur?

The possession date will be confirmed in the RERA filing at the December 2026 launch. Infrastructure work covers 8 milestones across approximately 2 to 3 years from launch. Verify the official date on rera.karnataka.gov.in after registration.

5. Can I build a holiday home on my plot after possession?

Yes. After possession, you may build a home or holiday retreat on your plot. Construction must follow the approved building plan and local municipal bye-laws. The township delivers roads, utilities, and open spaces before possession.

6. Can buyers track infrastructure progress on RERA?

Yes. Once registered, Prestige Group must update the Karnataka RERA portal every quarter. Go to rera.karnataka.gov.in and search the project RERA number after the December 2026 launch. Each quarterly update shows the completion percentage for each infrastructure stage.